What is this notice about?
The Alaska Department of Transportation & Public Facilities (DOT&PF) plans to do maintenance and repair work on about 30 bridges in its Northern Region, including bridges on the Steese, Denali, Elliott, Richardson and Copper River highways. Work includes cleaning, replacing rails, bolts and seals, and fixing curbs and grout pads, with construction expected to start in 2027. The public can send written comments by November 27, 2026.
Why was this notice issued?
DOT&PF is asking for public comments as part of the environmental review for a federally funded bridge project. It is following Section 4(f) of the Department of Transportation Act, Section 106 of the National Historic Preservation Act, and Executive Orders on floodplains, wetlands, environmental justice, cultural resources and invasive species. DOT&PF carries out this federal environmental review under 23 U.S.C. 327 and an agreement with the Federal Highway Administration dated April 13, 2023.
What action is being taken?
DOT&PF proposes preventive maintenance and repair on existing bridges along National Highway System (NHS) non-interstate and Community Transportation Program (CTP) routes in the Northern Region (State Project Number NFHWY01257, federal fiscal year 2027). Locations include Cantwell Road, Circle Hot Springs Road, Copper River Highway, Denali Highway, Elliott Highway, Eureka-Rampart Road, Illinois Street (Noyes Slough Bridge), Point Whitshed Road, Richardson Highway, Steese Highway, Tanana Road and Tofty Road. Work includes:
- cleaning bridges and removing debris
- replacing rails, rail posts, bolts, strip seals and wear surfaces
- re-sealing expansion joints and cracks
- repairing curbs and grout pads
- encasing an eroded pile in concrete
Some equipment will work below bridges, but no temporary fill or work pads are expected. No changes to stream channels are expected, and there will be minor encroachments into floodplains. Construction is expected to begin in 2027.
Who is involved: Alaska Department of Transportation & Public Facilities (DOT&PF), Northern Region; Federal Highway Administration
How can the public respond?
Respond by
Fri, Nov 27, 2026
4 days from today.
“by November 27, 2026”
Ways to respond
- Mail
Melissa Riordan, Department of Transportation & Public Facilities, 2301 Peger Road, Fairbanks, Alaska 99709-5316
- Email
melissa.riordan@alaska.gov
What to include
Comments must be written. Refer to the Northern Region FFY27 NHS Non-Interstate & CTP Bridge Preventative Maintenance and Repair project, State Project Number NFHWY01257. The contact phone is 907-451-2621. Text telephone (TTY) users can call 711 or 1-800-770-8973.
Contact
Melissa Riordan
Alaska Department of Transportation & Public Facilities
melissa.riordan@alaska.gov
907-451-2621; TTY: 711 or 1-800-770-8973
2301 Peger Road, Fairbanks, Alaska 99709-5316
Will there be public meetings?
The notice does not announce any public meeting or hearing.
Key dates
- Nov 17, 2026: Notice published
- Nov 27, 2026: Deadline for written public comments
Original notice text
Notice of Intent and Public Comment
Northern Region FFY27 National Highway System (NHS) Non-Interstate & Community Transportation Program (CTP) Bridge Preventative Maintenance and Repair
State Project Number: NFHWY01257
The State of Alaska Department of Transportation & Public Facilities (DOT&PF) is requesting public comments and information on the proposed Northern Region FFY27 NHS Non-Instate & CTP Bridge Preventive Maintenance and Repair project.
The project purpose is to complete preventative maintenance and preservation measures on existing bridges at select locations along the NHS Non-Interstate & CTP routes in the Northern Region. Specifically bridge maintenance work is proposed at the following locations: Cantwell Road at the Jack River Bridge Milepost (MP) 0.7; Circle Hot Springs Road at the Deadwood Creek Bridge MP 2.8, and Ketchum Creek Bridge MP 5.7; Copper River Highway at John W. Jones Bridge MP 27.4, Mathew Anderson Bridge MP 28.3, and W.H. Mumby Bridge MP 27.8; Denali Highway at Brushkana Creek Bridge MP 104.3, Canyon Creek Bridge MP 94.8, Clearwater Creek Bridge MP 55.9, and Seattle Creek Bridge MP 110.9; on the Elliot Highway at Baker Creek Bridge MP 130.5, Hutlinana Creek Bridge MP 129.3, and West Fork Tolovana River Bridge MP 74.9; Eureka-Rampart Road at Boston Creek Bridge MP 2.0 and Granite Creek Bridge MP 11.0; Illinois Street at Noyes Slough Bridge MP 0.6; Point Whitshed Road at Harney Bay Bridge MP 5.1 and MP 1.8; Richardson Highway at the Lowe River Lower Keystone Bridge MP 15.3; Steese Highway at Ptarmigan Creek Bridge MP 101.4, Bear Creek Bridge MP 97.6, Belle Creek Bridge MP 41.5, Boulder Creek Bridge MP 125.3, Trooper Gabe Rich Memorial Bridge MP 125.3, Chena River Bridge MP 0.6, Fish Creek Bridge MP 99.8, Mammoth Creek Bridge MP 116.5, McKay Creek Bridge MP 42.7, North Fork 12 Mile Creek Bridge MP 89.2, Reed Creek Bridge MP 88.6, Willow Creek Bridge MP 95.7, and Fairbanks Mining Road Undercrossing Bridge MP 21.2; Tanana Road at Boulder Creek Bridge MP 0.0; Tofty Road at Blowback Creek Bridge MP 9.4.
The proposed work will include:
• clean bridges and remove debris,
• replace missing rail posts and deck connection plates,
• replace diaphragm,
• re-weld 2-rail pile cracks,
• replace bridge and bull rails,
• repair curbs,
• replace erosion mat anchors,
• replace & install bridge number plates,
• clean and re-seal expansion joints,
• remove protruding nails and grout nail holes,
• grout rail base plates,
• replace and tighten nuts and bolts,
• clean and seal saw cut cracks,
• replace and install caps on utiliducts,
• replace wear surfaces,
• encase eroded pile column in concrete,
• re-attach pile cross bracing,
• replace strip seals,
• replace transition rail spacer block,
• replace sheared bolt studs,
• repair spalled grout pads.
Some of the work will require equipment to operate below the bridge, but no temporary fill or work pads are anticipated. Once work is complete, equipment will be removed with no alternations to the stream channel expected. The proposed project will have minor encroachments into the floodplains of the respective bridges listed above.
Construction for the proposed project is anticipated to begin in 2027.
The project is being developed in accordance with the following special purpose regulations including Section 4(f) of the Department of Transportation Act; Section 106 of the National Historic Preservation Act; and the following Executive Orders (EO): EO 11988 (Floodplain Management); EO 11990 (Wetlands Protection); EO 12898 (Environmental Justice); EO 11593 (Protection and Enhancement of the Cultural Environment); and, EO 13112 (Invasive Species).
To ensure that all possible factors are considered, please provide written comments to the following address by November 27, 2026[
Melissa Riordan
Department of Transportation & Public Facilities
2301 Peger Road
Fairbanks, Alaska 99709-5316
Telephone: 907-451-2621
Text Telephone (TTY): 711 or 1-800-770-8973
Email: melissa.riordan@alaska.gov
The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by the DOT&PF pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated April 13, 2023 and executed by the Federal Highway Administration and DOT&PF.
It is the policy of the Alaska DOT&PF that no one shall be subject to discrimination on the basis of race, color, national origin, sex, age, or disability, regardless of the funding source, including Federal Transit Administration, Federal Aviation Administration, Federal Highway Administration, Federal Motor Carrier Safety Administration, and State of Alaska funds. Full Title VI Nondiscrimination Policy: https://dot.alaska.gov/cvlrts/titlevi.shtml. To correspond by text telephone (TTY), call 711 or 1-800-770-8973.
This summary was written by an AI model (Claude) from the official notice text.
This is general information, not legal advice. Always confirm deadlines and instructions in the official notice. Legal disclaimer.