What is this notice about?
The Alaska Department of Transportation and Public Facilities (DOT&PF) is starting engineering and environmental studies on a plan to redesign lanes on the Seward Highway, Ingra Street and Gambell Street in Anchorage to improve safety, sidewalks and snow storage. Some of the work would happen in the 100-year floodplain of Chester Creek, but the agency does not expect it to change flood levels. The public can send written comments by December 7, 2026.
Why was this notice issued?
DOT&PF, which has assumed the Federal Highway Administration's (FHWA) environmental responsibilities under 23 U.S.C. 327, is soliciting comments and information on the proposal as it begins engineering and environmental studies. Notice is also given because the project would encroach into the base (100-year) floodplain of Chester Creek (FEMA FIRM Panels 0200050753D and 0200050751D).
What action is being taken?
DOT&PF proposes to reconfigure the road layouts on the Seward Highway from Northern Lights Boulevard to 20th Avenue, Ingra Street from 20th Avenue to 4th Avenue, and Gambell Street from 20th Avenue to 3rd Avenue. Work would include resurfacing and repairs (digouts), non-motorized and Americans with Disabilities Act (ADA) improvements, traffic and pedestrian signal installation or changes, channelization or minor access control changes, drainage improvements, guardrail or barriers, signs, striping and roadside hardware, utility relocations, and vegetation clearing and grubbing. Work in the Chester Creek floodplain and floodway would include structural repairs and digouts, pedestrian and ADA improvements, drainage improvements, hardware installation, and vegetation clearing. No longitudinal or significant encroachment and no net change to base flood elevations is expected. The project will comply with Section 106 of the National Historic Preservation Act, Executive Orders 11990 (Wetlands Protection) and 11988 (Floodplain Protection), the Clean Air Act, Clean Water Act, Fish and Wildlife Coordination Act, and U.S. DOT Act Section 4(f). Construction is anticipated to begin in summer 2028.
Who is involved: Alaska Department of Transportation and Public Facilities (DOT&PF); Federal Highway Administration (FHWA); users of the Seward Highway, Ingra Street and Gambell Street in Anchorage
How can the public respond?
Respond by Mon, Dec 7, 2026 14 days from today.
“December 7, 2026”
Ways to respond
- Mail Heidi Zimmer, Regional Environmental Manager, DOT&PF Preliminary Design & Environmental, P.O. Box 196900, Anchorage, Alaska 99519-6900
- Email Heidi.Zimmer@alaska.gov
What to include
Comments must be written. For questions or more information, contact Galen Jones, P.E., Project Manager, at (907)269-0550 or galen.jones@alaska.gov. Individuals with a hearing impairment can contact DOT&PF by Telephone Device for the Deaf (TDD) at (907) 269-0473.
Contact
Galen Jones, P.E., Project Manager
Alaska Department of Transportation and Public Facilities
galen.jones@alaska.gov
(907)269-0550
Will there be public meetings?
The notice does not announce any public meeting or hearing.
Key dates
- Dec 7, 2026: Deadline for written comments
Original notice text
This summary was written by an AI model (Claude) from the official notice text. This is general information, not legal advice. Always confirm deadlines and instructions in the official notice. Legal disclaimer.